We Will go through all the stages of construction

nexus.innovations@gmail.com

Jabal Al Ziybani Al Dhubbat Dist Riyadh

List of Awarded Projects

S.NoContractor NameJob DescriptionProject NameLocationType
1Al Jomaih Can Making PlantSupply and apply two coat of Transparent Seal Coat Sika Paint Sikafloor ‐359 BH ClearRiyadhCivil
2Al Jomaih Can Making PlantCivil Work consisting of Floor Maintenance and Epoxy Coating of Plant FloorCivil Work inside PlantRiyadhCivil
3Al Rashid Food Company LtdCivil Work for Construction of New Electric RoomCivil Work for New Electric RoomRiyadhCivil
4Alpha Plastic Middle East Saudi Idustrial CoRepairing of Expansion joint and Cracks at PET Production Floor with Exposy Painting of Production FloorCivil Work inside PlantDammamCivil
5Al Jomaih Bottling PlantTransformer Testing Comprising of Analyzing Energy, Voltage Fluctuation, harmoninc Distortion and Power Factor AnalysisTransformer TestingQassimElectrical
6Al Jomaih Bottling PlantSupply and Installation of New MDB-TR3 along with Cable Termination and Testing & CommissioningSupply and Installation of Electrical Panel and Cable TerminaterRiyadhElectrical
7Al Jomaih Bottling PlantSupply and installation MDB Panles for Aquafina Water Line. Supply and installation of Cable For Aquafina Water Line.Supply and installation of Cable Ladder Aquafina Water Line. Supply and installation 10 Ton PETRA Unit for MDB Room.New Aquafina Water LineQassimElectrical
8Al Jomaih Bottling PlantSupply and installation MDB Panles For Transformer -3MDB Panles For Transformer -3QassimElectrical
9Al Jomaih Bottling PlantPower Factor / Power Analyzing Study for 10 No, Transformers with Fluke Power Logger 1736 Submit POWER QUALITY REPORT with Solution. Supply and install and testing New Power Factor Panels with required power factor .98Energy audit Study for Qassim PlantQassimElectrical
10Al Jomaih Can Making PlantSupply and installation of Cable 3(3x240mm2+N+E) From Old existing Steel Line Supply and Installation of New MDB Panels
Supply and installation of Cable 2(3x120mm2+N+E)
Supply and Installation of Cable Tray 60x10cm HDG without cover Total
Supply and installation of new ALU Facility MDP Panel.
Supply and installation of new ALU ZR160 air compressor 630A new Panel.
Cable Termination Testing & commissioning.
New Line for Can making PlantRiyadhElectrical
11Internationl Refereshments Co Ltd.Power Expansion for Battery Charging RoomSupply and Installation of Cable for Power ExpansionRiyadhElectrical
12Internationl Refereshments Co Ltd.Supply and installation of LED Lights for Krones Can & NRB Line Supply and installation of Power Panels.RiyadhElectrical
13ITEA International CoSupply and install the ATS panel & generator included cable termination ETC for the RADAR Operation . Installed the daily and weekly diesel tank.Prince Sultan Air BaseAl KharjElectrical
14ITEA International CoSupply and install the ATS panel included cable termination ETC.GHQ (General Head Quarter) Exit -13RiyadhElectrical
15Petro Min CoSupply and instllaion of High Bay Light & Having Maintenance contract for all Riyadh Petro min StationMaintenance of StationRiyadhElectrical
16Saudi Snacks Food Co (PEPSICO)Supply and installation of New Cable 4x400MM2
Supply and installation of New Cable 4x300MM2
Supply and installation of New Cable 1x400MM2
Earthing Testing for the hole plant Riyadh and Damman
MDB,S Panel Maintenance For Riyadh Plant
Arch Flush study for Dammam Plant
Lighting Arrester Testing for Riyadh Plant
Compressor Upgradation ProjectRiyadh/DmmamElectrical
17Saudi Snacks Food Co (PEPSICO)Replacement of Clextral Extruder Damaged CableReplacement of Electrical CableRiyadhElectrical
18